An asbestos refurbishment survey is required before any refurbishment work is carried out. This type of survey is used to locate and describe, as far as reasonably practicable, all ACMs in the area where the refurbishment work will take place.


The survey will be fully intrusive and involve destructive inspection, as necessary, to gain access to all areas, including those that may be difficult to reach.

Request a Call Back

Asbestos Compliance During Construction Work

A refurbishment survey may also be required in other circumstances, eg when more intrusive maintenance and repair work will be carried out or for plant removal or dismantling.


There is a specific requirement in CAR 2012 (regulation 7) for all ACMs to be removed as far as reasonably practicable before major refurbishment or final demolition.

Request a Call Back

CDM & Asbestos

Removing ACMs is also appropriate in other smaller refurbishment situations which involve structural or layout changes to buildings (eg removal of partitions, walls, units etc). Under CDM, the survey information should be used to help in the tendering process for removal of ACMs from the building before work starts.


The survey report should be supplied by the client to designers and contractors who may be bidding for the work, so that the asbestos risks can be addressed during the planning stages of the project.


In this type of survey, where the asbestos is identified so that it can be removed (rather than to ‘manage’ it), the survey does not normally assess the condition of the asbestos, other than to indicate areas of damage or where additional asbestos debris may be present.

Request a Call Back

Asbestos Refurbishment Survey Areas

Refurbishment surveys are intended to locate all the asbestos in the building (or the relevant part), as far as reasonably practicable. It is a disruptive and fully intrusive survey which may need to penetrate all parts of the building structure.


Aggressive inspection techniques will be needed to lift carpets and tiles, break through walls, ceilings, cladding and partitions, and open up floors. In these situations, controls should be put in place to prevent the spread of debris, which may include asbestos.


Refurbishment surveys should only be conducted in unoccupied areas to minimise risks to the public or employees on the premises. Ideally, the building should not be in service and all furnishings removed.

Request a Call Back

What We Will Do For You

For minor refurbishment, this would only apply to the room involved or even part of the room where the work is small and the room large. In these situations, there should effective isolation of the survey area (eg full floor to ceiling partition), and furnishings should be removed as far as possible or protected using sheeting.


The ‘surveyed’ area must be shown to be fit for reoccupation before people move back in. This will require a thorough visual inspection and, if appropriate (eg where there has been significant destruction), reassurance air sampling with disturbance.


Under no circumstances should staff remain in rooms or areas of buildings when intrusive surveying and sampling is being performed.

Request a Call Back

Pricing

Prices for our Asbestos Refurbishment Surveys start from just £295 + VAT

Need an asbestos refurbishment survey?


We’re here to help!

We want to know your needs exactly so that we can provide the perfect solution.


Let us know what you want and we’ll do our best to help.

Request a Call Back
Share by: